全国统一服务热线 15189911122

联系方式

电话:15189911122

传真:0523-89989358

办公地址:江苏省泰州市医药高新区鼓楼南路99号华润国际花园10幢1609室

On stage machinery 当前位置:首页 > Products > On stage machinery
< >
Single point crane

Lifting point Movable single point crane can be used to suspend the three-dimensional stage set, also can be between the two boom to provide hanging point.

15189911122

在线咨询

1. Lifting point Movable single point crane can be used to suspend the three-dimensional stage set, also can be between the two boom to provide hanging point.

2. Lifting point Movable single point crane The use of hanging point wheel in the track slide on the track single point crane way.

3. Each single point of the crane can be run separately, you can also a few single-point crane combination of synchronous operation.

4. Technical Specifications: Model: D250

Positioning accuracy: ± 3mm

Hanging point speed: 0.006 ~ 0.6m / s Load lifting point: 2.5kN noise: <45dB (A) winding rope length: 2.5 times the stroke

The point hoist hook by the hoisting system, track, and control system protection devices and associated ancillary components and other components.

Specifically:

A hook with a hammer

· Turn the pulley

· Track / pulley frame

· Winch system: motor, reducer, brake, reel, pulley components, wire rope and accessories.

Protection device: overtravel switch, loose rope detection, chaos rope detection, overload alarm and so on.

6. The control system requires a computer or programmable controller may control on the main console, the portable operation panel, pendant, hanging operation panel.

7. On the console (tray), you can set the position (travel), speed (time), and with the action status.

8. Location display and memory storage and other functions. On the console there are up, down and emergency stop buttons and separate joysticks.


单点吊机1.jpg


单点吊机2.jpg


办公地址:江苏省泰州市医药高新区鼓楼南路99号华润国际花园10幢1609室
联系方式:15189911122   传真:0523-89989358   在线QQ:738190100   公司邮箱:738190100@qq.com
版权所有:江苏佳美演艺设备有限公司   苏ICP备12014174号-1
技术支持:易动力网络

在线咨询